I decided to go down this path and hope to have my system built by March 2014. I will be using the Blichmann 20 gallon pots with electric heating in the HLT & BK. I am curious if anyone has done the system calibration runs with a similar set up (valves will be added later) and if there is an easy way to get BTP recipes into the BrewTroller program. At this point just looking at options and checking if anyone else has gone down this path.
Thanks for your time in advance.
Mike
BrewTroller calibration and programming from recipe
Moderator: slothrob
BrewTroller calibration and programming from recipe
Mike Moore
N5RWH
N5RWH