Page 1 of 1

SCHEDULE!!!!!

Posted: Tue Mar 10, 2009 12:57 pm
by RJH311
so the schedule utilities in BTP 1.0 were VASTLY better than 1.5 i've run into problems with getting the correct sparge volume to display and throwing my recipes off. also the schedules i imported from 1.0 have things like decoctions which work when transfered but there is no way to author them in 1.5. no good. lastly, there is no preset schedules like in 1.0. FIX THIS STUFF!!!

Re: SCHEDULE!!!!!

Posted: Tue Mar 10, 2009 8:05 pm
by slothrob
RJH311 wrote:i've run into problems with getting the correct sparge volume to display and throwing my recipes off.
Try ticking the lock box in the Separation Editor window, this should calculate your sparge volume automatically. You may also need to adjust the residual volumes to "0".
also the schedules i imported from 1.0 have things like decoctions which work when transfered but there is no way to author them in 1.5.
You can create decoction stages in the Schedule window with the Recipe>Add>Decoction menu or by ctrl-clicking onto the Schedule window.